Assessing the Additional Power Requirements of Artificial Intelligence in the United States by 2030

RAND Corporation's analysis of US energy system capacity to meet growing AI electricity demand — projections, bottlenecks, and recommendations.

1,000 GW
New Power Projects Planned
2030
Target Year for Assessment
FTM+BTM
Grid & Consumer-Side Capacity
Abstract

The RAND Corporation research study entitled "Assessing the Additional Power Requirements of Artificial Intelligence in the United States by 2030" analyses the ability of the US energy system to meet the growing electricity demand caused by artificial intelligence (AI) development. The study presents projections for potential increases in generating capacity on both the grid side (FTM — front-of-the-meter) and the consumer side (BTM — behind-the-meter).

The report proposes a new metric for more accurately comparing available supply with expected demand. This approach accounts for the significant gap between planned projects and actual capacity that becomes operational, addressing the "great shrinkage" phenomenon where ambitious plans face implementation challenges.

The authors conclude that, without significant changes to capacity expansion plans and the elimination of bottlenecks in the process of connecting new projects, a shortage of capacity is likely to occur by 2030. The report also provides recommendations for regulators and system operators to accelerate the integration of more reliable resources, such as energy storage and gas turbines.

RAND Corporation Report
Assessing the Additional Power Requirements of Artificial Intelligence in the United States by 2030

RAND Corporation Research Study

Read on RAND.org
Key Finding: Without significant changes to capacity expansion plans and elimination of connection bottlenecks, a shortage of capacity is likely by 2030.